Running a Device Rebuild
3. Click the Rebuild button in the Disk Device Information dialog box.
Rebuild runs and the Rebuild Status box appears (see the previous chapter).
Close the box and continue or leave the box open until Rebuild has
completed.
When rebuild has completed, the selected physical device AND the logical
drive(s) of which it is a part are returned to operational status. If you cancel
rebuild, the device returns to its offline (dead) status (red X), and the logical
drives that occupy this physical device all go to critical status (yellow
exclamation point). You must complete a future rebuild to return the
physical device and logical drive(s) to operational status.
6-6
GAM Client User's Guide
Need help?
Do you have a question about the Global Array Manager and is the answer not in the manual?
Questions and answers