Process Status Monitoring
Figure 5-20. Rebuild Status Box
Click Cancel to stop the rebuild. You may need to check the Views menu to
see if Rebuild Status is still enabled. If so, you may need to cancel other
rebuilds as well.
Click Close to close the Rebuild Status box at any time.
Consistency Check Status
If a consistency check process is currently underway, open the Consistency
Check Status box as shown in Figure 5-21 to monitor the consistency check
progress or cancel the process.
Figure 5-21. Select "Consistency Check Status"
The Consistency Check Status box (Figure 5-22) displays the progress of a
logical drive consistency check.