PORT MIRRORING AND SETUP
9–16
See details in Broadcast Storms on page 9–7 to determine the threshold level.
After changes are made, do not forget to save the changes using
the save icon (
If the switch is rebooted before the changes are made, the changes
will be lost.
CHAPTER 9: PORT MIRRORING AND SETUP
).
MULTILINK ML1200 MANAGED FIELD SWITCH – INSTRUCTION MANUAL
Need help?
Do you have a question about the MultiLink ML1200 and is the answer not in the manual?
Questions and answers