Asus DS300i User Manual page 239

User manual
Hide thumbs Also See for DS300i:
Table of Contents

Advertisement

subsystem or controller before reconditioning is finished, the battery is charged to
100%, then reconditioning starts again.
Reconditioning a Battery
To recondition the subsystem battery:
1.
From the Main Menu, highlight Subsystem Management and press Enter.
2.
Highlight Enclosure Management and press Enter.
3.
Highlight Batteries and press Enter.
4.
Highlight the battery you want to recondition and press Enter.
5.
Highlight Start Reconditioning and press Enter.
6.
Press Y to confirm.
Reconditioning fully discharges, then fully recharges the battery. During
reconditioning, if the Adaptive Writeback Cache function is enabled, the
controller cache is set to Write Thru. After reconditioning, the cache is reset
to Write Back. See ―Making Controller Settings‖ on page 213.
Locating an Enclosure
This feature helps you identify the physical ASUS Storage enclosure you are
working with through the CLU.
1.
From the Main Menu, highlight Subsystem Management and press Enter.
2.
Highlight Enclosure Management and press Enter.
3.
Highlight Locate Enclosure and press Enter.
The disk status LEDs and the LEDs on the back of the enclosure blink for
one minute. See the Figures below.
Figure 5. Disk Status LED
Chapter 6: Management with the CLU
220
Disk Status

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds300f

Table of Contents