# raidcom monitor pool -pool my_tier_pool -operation stop
raidcom reallocate pool
Sets the start or stop of tier reallocation of a pool for Smart Tiers.
Syntax
raidcom reallocate pool -pool {<pool ID#> | <pool naming>} -operation <type>
Options and parameters
Option
-pool {<pool ID#> |
<pool naming>}
-operation <type>
Examples
Starting the tier reallocation of a pool for Smart Tiers of the Pool: 20.
raidcom reallocate pool -pool 20 -operation start
Starting the tier reallocation of a pool for Smart Tiers of the Pool Name: my_tier_pool.
# raidcom reallocate pool -pool my_tier_pool -operation start
Stopping the reallocation of a pool for Smart Tiers of the Pool: 20.
raidcom reallocate pool -pool 20 -operation stop
Stopping the reallocation of a pool for Smart Tiers of the Pool Name: my_tier_pool.
# raidcom reallocate pool -pool my_tier_pool -operation stop
raidcom get command_status
Displays error information of the configuration setting command (asynchronous command) to be
executed asynchronously.
When an error occurs with the execution of an asynchronous command, the total number of errors,
or error information such as error codes (SSB1 and SSB2) that are stored in the DKC at the first
time occurrence. After executing asynchronous command, check the error information by executing
this command.
However, an error from the second occurrence, error codes SSB1 and SSB2 will not be stored. To
be able to refer the error code when an error occurs, reset the error information stored by the DKC
by executing raidcom reset command_status before and after executing asynchronous command.
Syntax
raidcom get command_status [-time <time(sec)>]
194 Configuration setting commands
Description
Specifies a pool ID (0- 1 27) or a pool name of a pool for Smart Tiers.
When specifying just a number, it is recognized as a pool ID. Therefore, when you specify
a pool that the pool name is only a number, operate by specifying pool ID instead of
specifying pool name.
Reallocation operation instruction
The operational types that can be specified:
start: Start the tier reallocation.
stop: Stop the tier reallocation.