1. Servers
2. HP StorageWorks P4000
3. Storage cluster
4. GigE trunk
5. Active path
6. Passive path
Figure 35 Active-Passive in a two-switch topology with server failover
.
The two-switch scenario in
availability. If either switch fails, or a cable or NIC on one of the storage systems fails, the Active-Passive
bond causes the secondary connection to become active and take over.
Figure 35
on page 91 is a basic, yet effective, method for ensuring high
P4000 SAN Solution user guide
91