Step 2: Placing Tinnerman Nuts On The Front Columns - HP D5970A - NetServer - LCII User Manual

Hp netserver lxr pro8 user guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 7
5. Repeat steps 1 through 6 to attach the second rail to the left-hand rack
columns.

Step 2: Placing Tinnerman Nuts on the Front Columns

1. Place two Tinnerman nuts on the right front column of the rack. See
Figure 7-4.
Place the first nut in the twelfth hole above the bottom of the
mounting rail.
Place the second nut in the twenty-sixth hole above the bottom of the
rail.
When the HP NetServer is installed on its rails, these nuts must line up
with the slots in the flanges on the front of the HP NetServer. You will
insert screws through the flanges' holes and into the Tinnerman nuts.
Figure 7-4. Placing Tinnerman Nuts on the Front Column
62
Twenty-Sixth
Hole
Twelfth Hole
Bottom of
mounting rail
Mounting the Server in the Rack

Advertisement

Table of Contents
loading

Table of Contents