Installing and Configuring the Edge Switch 2/24
Table 3: Switch Operational States and Symbols
Operational — switch-to server communication is established, the
switch is operational, and no failures are indicated. Go to
Switch Date and
Degraded — switch-to server communication is established, but the
switch is operating in degraded mode and requires service. This
condition is typical if a port or redundant FRU fails. Go to
Failed — switch-to server communication is established, but the
switch failed and requires immediate service. Go to
Status Unknown — the switch status is unknown because of a
network communication failure between the switch and HAFM
server. Go to
3. Double-click the switch icon. The Hardware View page for the selected
48
Operational State
Time" on page 50.
step
3.
switch displays
(Figure
Flashing red and yellow diamonds, and switch degradation is indicated by the
yellow triangle at the alert panel.
12). In the example, FRU failures are indicated by