Verifying Communication Between The Edge Switch And The Hafm Appliance; Edge Switch Operation Al States And Symbols - HP 316095-B21 Installation Manual

Edge switch 2/32
Hide thumbs Also See for 316095-B21:
Table of Contents

Advertisement

3.
Enter an Edge Switch description (for example, edge-32) in the Description box.
4.
Enter the Edge Switch IP address (determined by the customer's network administrator) in the IP
Address box.
Enter the Edge Switch subnet mask (determined by the customer's network administrator) in the
5.
Subnet Mask box.
6.
Click OK to save the entered information, close the dialog box, and identify the Edge Switch to
the HAFM application.
7.
Repeat
step 2
8.
Click OK to close the Discover Setup dialog box and return to the HAFM application.

Verifying communication between the Edge Switch and the HAFM appliance

To verify communication between the Edge Switch and the HAFM appliance Element Manager and
HAFM Basic applications:
1.
At the management application's main window (physical map or product list), inspect the shape
and color of the status symbol associated with the Edge Switch product icon.
Table 3
explains the symbols and associated operational states.

Edge Switch operation al states and symbols

Table 3
Operational state
Operational—Edge Switch-to-appliance communication is established,
the Edge Switch is operational, and no failures are indicated. Go to
"Setting the Edge Switch date and time" on page
Degraded—Edge Switch-to-appliance communication is established, but
the Edge Switch is operating in degraded mode and requires service.
This condition is typical if a port or redundant FRU fails. Go to
F
ailed—Edge Switch-to-appliance communication is established, but the
Edge Switch failed and requires immediate service. Go to
Status Unknown—The Edge Switch status is unknown because of a
network communication failure between the Edge Switch and HAFM
appliance. Go to
2.
Right-click the Edge Switch icon at the HAFM application's physical map.
A pop-up menu is displayed.
3.
Select Element Manager from the pop-up menu.
42
Connecting the Edge Switch
through
step 6
for each new Edge Switch.
step
2.
43.
step
2.
step
2.
Symbol

Advertisement

Table of Contents
loading

Table of Contents