Engine Component Inspection And Service - HYOSUNG COMET 125 Service Manual

Hide thumbs Also See for COMET 125:
Table of Contents

Advertisement

3-19 ENGINE
ENGINE COMPONENT INSPEC-
TION AND SERVICE
CAUTION
Be sure to identify each removed part as to its loca-
tion, and lay the parts out in groups designated as
Front cylinder , Rear cylinder , Exhaust ,
Intake , so that each will be restored to the origi-
nal location during assembly.
CYLINDER HEAD DISTORTION
Decarbonate in combustion chamber.
Check the gasketed surface of the cylinder head for dis-
tortion with a straightedage and thickness gauge, taking
a clearance reading at several places as indicated. If the
largest reading at any position of the straightedge
exceeds the limit, replace the cylinder head.
Cylinder head
distortion
Thickness gauge : 09900-20806
VALVE FACE WEAR
Visually inspect each valve face for wear. Replace any
valve with an abnormally worn face. The thickness of
the valve face decreases as the face wears. Measure
the valve head
. If it is out of specification, replace the
valve with a new one.
Valve head thickness
Vernier calipers : 09900-20101
VALVE STEM RUNOUT
Check the valve stem for abnormal wear or bend.
Place the valve on V-blocks and measure runout.
If the service limit is exceeded or abnormal condition
exists, replace the valve.
Valve stem runout
Dial gauge : 09900-20606
Magnetic stand : 09900-20701
V-block : 09900-21304
Service limit
0.05 mm (0.002 in)
Service limit
0.5 mm (0.02 in)
Service limit
0.05 mm (0.002 in)
(T.D.C)
(B.T.D.C)
Intake open
19
32
(A.B.D.C)
57
Intake close
(B.D.C)
Valve timing diagram
(A.T.D.C)
Exhaust close
38
(B.B.D.C)
Exhaust open

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents