Omron K3NP - 1998 Operation Manual page 104

Period meter
Table of Contents

Advertisement

Connectors
Connection Example
Process Meter
Signals
96
23.DSV
Note
1. Connect RD2-1 through RD2-4, RS3-1 through RS3-4, RD4-1 through
RD4-4, and RD5-1 through RD5-4 in the same way as RD1-1 through
RD1-4.
2. Connect the RUN and OVER signals if they are used as status data.
When the HOLD signal is ON, the measurement operation stops and the pro-
cess value input effective immediately before the HOLD signal is retained.
When the RESET signal is ON, the maximum and minimum values are set to the
process value.
The OVER signal is ON when the input value is not within the display range.
Section 7-1
SYSMAC Programmable Controller
DC Input Unit
Transistor Output Unit
DC power supply

Advertisement

Table of Contents
loading

This manual is also suitable for:

K3np

Table of Contents