Connection Work - Beko DRYPOINTRA III 20 Translation Of Original Installation And Operation Manual

Compressed air refrigeration dryer
Table of Contents

Advertisement

Original installa�on and opera�on manual
7.2

Connection work

For electrical installation work to be carried out, the following protective equipment must be always worn
and the preparatory tasks must have been completed.
Tools
No tool necessary
1ph+N models: A protective contact socket is installed within reach of the place of
1.
installation.
3ph models: A protective contact socket or a terminal box is installed within reach of the
2.
place of installation.
Fusing of protective contact socket / terminal box is correctly dimensioned for the power
3.
consumption.
4.
Assembly of the product is complete.
ON-OFF switch of the product is in OFF position.
5.
Have the necessary tools and materials ready.
6.
3ph models: a power cable correctly dimensioned for the power consumption of the product
7.
and with a suitable length is ready and available.
The section "4.7 Connections" on page 49 was read and applied.
8.
62 | 118
Prerequisites
Material
No material necessary
Preparatory tasks
DRYPOINT
Protective equipment
®
RA III

Advertisement

Table of Contents
loading

Table of Contents