Original installa�on and opera�on manual
7.2
Connection work
For electrical installation work to be carried out, the following protective equipment must be always worn
and the preparatory tasks must have been completed.
Tools
•
No tool necessary
1ph+N models: A protective contact socket is installed within reach of the place of
1.
installation.
3ph models: A protective contact socket or a terminal box is installed within reach of the
2.
place of installation.
Fusing of protective contact socket / terminal box is correctly dimensioned for the power
3.
consumption.
4.
Assembly of the product is complete.
ON-OFF switch of the product is in OFF position.
5.
Have the necessary tools and materials ready.
6.
3ph models: a power cable correctly dimensioned for the power consumption of the product
7.
and with a suitable length is ready and available.
The section "4.7 Connections" on page 49 was read and applied.
8.
62 | 118
Prerequisites
Material
•
No material necessary
Preparatory tasks
DRYPOINT
Protective equipment
®
RA III