Connection Work - Beko DRYPOINT RA III 1080 Translation Of Original Installation And Operation Manual

Compressed air refrigeration dryer
Table of Contents

Advertisement

Original installa�on and opera�on manual
7.2

Connection work

For electrical installation work to be carried out, the following protective equipment must be always worn
and the preparatory tasks must have been completed.
Tools
No tool necessary
A 3ph+E protective contact socket or a terminal box is installed within reach of the place of
1.
installation.
Fusing of protective contact socket / terminal box is correctly dimensioned for the power
2.
consumption.
3.
Assembly of the product is complete.
4.
ON-OFF switch of the product is in OFF position.
5.
Have the necessary tools and materials ready.
A 3ph+E power cable correctly dimensioned for the power consumption of the product and
6.
with a suitable length is ready and available.
7.
The section "4.7 Connections" on page 39 was read and applied.