Assembly Work - Beko DRYPOINTRA III 20 Translation Of Original Installation And Operation Manual

Compressed air refrigeration dryer
Table of Contents

Advertisement

DRYPOINT
®
RA III
6.2

Assembly work

For assembly work to be carried out, the following protective equipment must be always worn and the
preparatory tasks must have been completed.
Tools
No tool necessary
Select and set up the place of installation according to the specifications in section "4.8
1.
Assembly conditions" on page 53.
The compressed air supply line, the condensate collection line, the cooling water line
provided by the customer are pressureless and secured against unintentional pressure build
2.
up.
Have the necessary tools and materials ready.
3.
4.
Prepare the required connection materials suitable for the pressure and temperature range.
Check the product for damage, only use the product in an undamaged state.
5.
The section "4.7 Connections" on page 49 was
6.
Align the product in such a way that the User Interface is easy visible and all connection
1.
elements are easy accessible.
Fix the product to the floor, if necessary.
2.
Compressed air: connect the threaded connection to the compressed air line.
3.
Cooling water, water-cooled models: connect the threaded connection to the cooling water
4.
line.
Condensate drain: connect the condensate drain hose to the drain collection line.
5.
6.
Install collision protection, if necessary.
Prerequisites
Material
No material necessary
Preparatory tasks
read and applied
Assembly work
Original installa�on and opera�on manual
Protective equipment
.
59 | 118

Advertisement

Table of Contents
loading

Table of Contents