Conventions:
Load designates the consumed energy by the load (W+)
Load C designates the capacitive reactive energy (W+ and var-)
Load L designates the inductive reactive energy (W+ and var+)
Supp designates the energy generated by the load (W-)
Supp C designates the capacitive reactive energy (W- and var-)
Supp L designates the inductive reactive energy (W- and var+)
7. To access the screens concerning the energies received by the load
(Load side), press the
term LoAd at the bottom of the screen.
The sequence of use is as follows:
I- Load h W ---> Load L h VAR ---> Load C h VAR ---> Load h VA ---> I
I <----------------------------------------------------------------------------------------- I
Example of LoAd side screen:
8. To access the screens concerning the energies generated by the load
and therefore received by the source (Supply side), press
the
bottom of the screen.
The sequence of use is as follows:
I - Supp h W ---> Supp L h VAR ---> Supp C h VAR ---> Supp h VA ---> I
I <------------------------------------------------------------------------------------------- |
Clamp-On Meter Model 607- User Manual
button to view the screens that have the term SuPP at the
button to view each screen that has the
41