Completion Of The Measurement; Longer Stop Of Operation - Swann AMU-II Oxytrace Operator's Manual

Table of Contents

Advertisement

AMU-II Oxytrace
Maintenance
6.6.5
6.7.
A-96.150.541 / 111223

Completion of the Measurement

1 Stop sample flow.
2 Close the flow regulating valve of the AMI Inspector Oxygen.
3 Disconnect the AMI Inspector Oxygen from the sample line.
4 Switch off the AMI Inspector Oxygen.
5 Restart and regulate the sample flow to the online instrument.

Longer Stop of Operation

1 Shut off power of the instrument.
2 Stop sample flow.
3 Remove the Swansensor Oxytrace G from the flow cell.
4 Clean the sensor with a soft tissue and rinse it with water.
5 Use a soft brush to remove the dirt which sticks on the walls of
the flow cell.
6 Fill the flow cell with water.
7 Install the Swansensor Oxytrace G.
43

Advertisement

Table of Contents
loading

Table of Contents