Branson 2000 Series Installation Manual page 26

Hide thumbs Also See for 2000 Series:
Table of Contents

Advertisement

Factory Air
Table 6
Installing the Leveling Fixture
Step
Shut off the line power, disconnect the AC power plug, and disconnect
1
the air supply.
Install the flat washer and spherical-head pivot pin into the center of the
2
Base Fixture surface. Refer to Figure 11.
3
Install the four Leveling screws into the holes as shown in Figure 12.
Carefully place the Leveling Fixture, chamfered edges up and thread
4
identifier towards the column, on the Base Fixture surface.
Install the four 1/4-20 locking screws, but do not tighten at this time.
5
Refer to Figure 13.
Figure 12 Spherical-head Pivot Pin
Spherical Head Pin and Washer
20
Action
Actuator Base
Insert here
100-214-226 Rev. 10