Leveling Fixture Setup; Preliminary Setup - Branson 2000 Series Installation Manual

Hide thumbs Also See for 2000 Series:
Table of Contents

Advertisement

2000 Series
Installation Guide
2.
Mount the base to your workbench using four socket-head cap screws (customer provided, 3/8 inch
(US bases) or M10 (metric bases)). Use flat washers against the metal casting to prevent gouging.
The use of nylon lock nuts with your cap screws is suggested, to reduce loosening due to vibration
and movement.
3.
Connect factory air to the air hose on the stand (3/8 NPT male fitting on the hose). A quick-
disconnect fitting is suggested. Use a lockout device on the air line if required.
4.
Verify the base/start switch control cable is properly connected to the back of actuator.
5.
Verify the linear encoder connector is properly connected to the back of the actuator.
Figure 11 Base mounting centers
7.37 in /
187 mm
14.75 in /
375 mm
Mounting Holes
accept 3/8 inch
or metric M10
cap screws

Leveling Fixture Setup

Preliminary Setup

The following plates utilize the Kit:
Plate Leveling, Inch
Plate Leveling, Metric
Plate 15 kHz Alignment/Leveling Combo
CAUTION
!
Before working on the welder, make sure to shut off the line power, disconnect the AC power
plug, and disconnect the air supply.
100-214-226 Rev. 10
28.0 in / 711 mm
M10
21.31 in / 541 mm
100-079-260
100-079-265
109-079-365
Factory Air
16.5 in /
419 mm
19