e. Fasten and tighten knurled nut to circuit breaker face plate on front of instrument panel.
f. Connect positive battery cable.
g. Activate circuit protected by replaced breaker. Check appropriate electrical items are functioning.
11-159. IGNITION SWITCH
11-160. REMOVAL OF IGNITION SWITCH
a. Make sure ignition switch is in OFF position.
b. Gain access to and disconnect power lead (+) from battery.
c. Remove retaining nut from switch and pull switch from back of instrument panel.
d. Note location of wires on ignition switch. Remove wires from switch.
11-161. INSTALLATION OF IGNITION SWITCH
a. Connect wires to ignition switch as shown in Figure 11-60.
b. Check for proper operation of ignition switch as follows:
1. Remove P lead from right magneto.
2. Attach P lead of right magneto to ohmmeter and to airframe ground.
3. With switch in OFF, L or START position, ohmmeter must indicate a closed circuit.
4. With switch in R or BOTH position ohmmeter should indicate an open circuit.
g. Connect P lead to magneto.
h. Position ignition switch in instrument panel and install retaining nut.
i.
Connect power lead (+) to battery.
j.
Install any access covers previously removed.
Revised: February 28, 1995
Figure 11-60. Ignition Switch Wire Positions
2G21
Island Enterprises
ELECTRICAL SYSTEM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Warrior ii pa-28-161 1995Warrior iii pa-28-161 1995

Table of Contents