Piper CHEROKEE WARRIOR PA-28-151 1995 Maintenance Manual page 128

Airplane
Table of Contents

Advertisement

PIPER CHEROKEE WARRIOR SERVICE MANUAL
1. If necessary to assemble pad and bladder:
A Apply a layer of 3M 847 cement to smooth side of bladder pad.
B Apply a layer of 3M 847 cement to back side of bladder (side away from inflation tube
nipple).
C Attach bladder pad to bladder.
While cement does not set immediately, there is no need to wait
before attaching bladder and pad to seat back filler.
2. Apply a layer of 3m 847 cement to rough side of bladder pad.
3. Apply a layer of 3m 847 cement to seat back filler where bladder is to be located.
4. Attach bladder and pad assembly to seat back filler. Depending on temperature and humidity,
allow 0:30 minutes to 1:00 hour for cement to set.
5. Install seat back filler cover and secure velcro fastenings.
6. Install seat in airplane.
Added: February 28, 1995
— NOTE —
THIS SPACE INTENTIONALLY LEFT BLANK
1F8
Island Enterprises
STRUCTURES

Advertisement

Table of Contents
loading

This manual is also suitable for:

Warrior ii pa-28-161 1995Warrior iii pa-28-161 1995

Table of Contents