Demolition And Disposal; Scheduled Maintenance - COMENDA AC2 Series Use And Maintenance Instructions

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11

3.4 DEMOLITION and DISPOSAL

When you intend to scrap the machine, drain the water from the tank and the boiler, as indicated in the previous
points, and disconnect the machine from the water and electric mains. Then dismantle the components
following that prescribed in the relevant standards in force in compliance with the national and local ecological-
environmental regulations, taking care to separate the parts as follows:
- metal parts: body, surfaces, panels, filters;
- electric parts: motors, contactors, microswitches, wires;
- plastic parts: fittings, dish racks;
- rubber parts: hoses, sleeves.
3.5

SCHEDULED MAINTENANCE

It is recommended to have the machine serviced every 6 MONTHS.
EN
37

Advertisement

Table of Contents
loading

Table of Contents