The library can contain up to 12 full-height tape drives per frame. Tape drives should be added moving
bottom to top starting with the control module and the lower drive cluster (see
drive cluster is filled, begin adding tape drives to the bottom position in the upper drive cluster. When the
control module drives are installed, move on to the next expansion module starting with the lower drive
cluster.
Figure 3
Drive installation locations
Scalar i2000 Installation Guide
Installing Tape Drives
12
11
10
9
8
7
6
5
4
3
2
1
Figure 3
). When the lower
41