Pist0021 - Us Fluoro Ups And Pdb Connection - GE Innova 2100-IQ Preinstallation Manual

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare

17 PIST0021 - US Fluoro UPS and PDB connection

17.1 Personnel Requirements
Required Persons
17.2 Preliminary Requirements
17.2.1 Tools and Test Equipment
Standard Service
Engineer's toolkit
17.2.2 Required Conditions
The PDB is already installed
Power cables are as follows: (1) From
PDB to UPS rectifier input = 4x6
AWG recommended (4x3 AWG max)
(3ph + PE). (2) Bypass = 5x8 AWG
recommended (5x3 AWG max)(3ph +
N+PE). (3) From UPS output to PDB = 5x8
AWG recommended (5x3 AWG max)(3ph
+ N+PE)..
Cable sizing shall follow local
requirements.
Power cable Mechanical Terminals Torque
Specification: < 3 Nm / < 27 lb.in for 20
AWG to 3 AWG.
Check the UPS shipping date marked
on the packaging label. Commissioning
of the UPS must be performed within 3
months after that date.
Chapter 6 Electrical Connections
Preliminary Reqs
1
Not Applicable
Item
Condition
Qty
Effectivity
-
1
Direction 5314528-2-1EN, Revision 1
Procedure
1 hour
Part#
-
Reference
-
-
-
-
-
Finalization
Not Applicable
Manufacturer
-
Effectivity
-
-
-
-
-
195