Ivus Option; Environmental Limitations In Use (Room Climate) - GE Innova 2100-IQ Preinstallation Manual

Cardiovascular imaging system
Hide thumbs Also See for Innova 2100-IQ:
Table of Contents

Advertisement

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
SEM (Super Eco Mode) permitting the maximum energy saving.
Table 3-4: Fluoro UPS CE
Table 3-5: Fluoro UPS UL
If installed in the technical room, the UPS may impact on it's layout. It may also
be installed in a separate room. This depends on hospital constraints, local
regulations or EHS rules. Clearance, weight of UPS, airflow and cooling system
should be adapted for the UPS.
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
CONNECTING THE CABLES FROM THE PDB TO THE UPS AND CONFIGURING
THE PDB IN BYPASS MODE. GEHC IS RESPONSIBLE FOR POWERING ON THE
SYSTEM WITH THE UPS IN BYPASS MODE. GEDE IS RESPONSIBLE FOR UPS
COMMISSIONING.
The Fluoro UPS can be installed either in an Electrical Local with restricted access
or in the innova technical room as per local regulations.
Make sure that local regulations have been applied for the installation of the Fluoro
UPS (dedicated room/fire detection etc.)
Refer to the UPS vendor Service manual Installation Guide SG Serie 10, 20, 30 & 40 kVA for
NOTE:
more details

2.2.3 IVUS Option

2.2.3.1 Environmental Limitations in Use (room climate)

Humidity (non condensing) :
Temperature (at 20% Relative Humidity ) :
Altitude (Relative to see level) :
50
Losses
VFI
SEM
2.14 kW
0.64 kW
Losses
BTU / hr
kW
6751
1.98
Direction 5314528-2-1EN, Revision 1
Cooling air flow
VFI
SEM
625 m 3 /h
190 m 3 /h
Cooling air flow
m 3 /h
CFM
301
512
30 - 80 %
15 - 32 C
max 3048 m
2 Environmental Requirements/Limitations
(60 - 90 F)
(max 10000 ft)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents