18-2
Overview (flow) of schedule operation creation
The following is the basic operating procedure when setting an operation schedule.
Operation flow
Create an operation pattern (Schedule Pattern)
→ See par. 18-3 Operation pattern creation
Select the schedule operation target.
Group or R/C group. → See par. 18-4-1 Selection of schedule operation target
Assign an operation pattern to the calendar.
Operation pattern assignment → See par. 18-4-2,3 Assigning operation pattern to calendar
Exceptional day setting → See par. 18-6 Exceptional day setting
At the end of setting, update the calendar.
→ See par. 18-4-5 Calendar updating
Copyright© 2013-2015 Fujitsu General Limited. All rights reserved.
18-4-4 Assigning the OFF day on the calendar
180