Expansion cards and OCP mezzanine cards
Concluding steps
▶
"Installing a riser module" on page
▶
"Installing the CX2550 M6 or CX2560 M6 server node" on page
▶ Reconnect all external cables.
▶
"Connectors, controls, and indicators" on page
▶ If applicable,
"Updating expansion card firmware" on page
▶ If applicable,
"After replacing or upgrading LAN controllers" on page
6.6.2
Removing expansion cards
Upgrade and Repair Unit
(URU)
Tools:
Phillips PH2 / (+) No. 2 screw driver
Preliminary steps
▶ Locate the desired server node with the ID button.
▶
"Shutting down the server node" on page
▶ Remove all external cables from the server node.
▶
"Removing server nodes from the server enclosure" on page
▶
"Removing a riser module" on page
▶ If applicable, remove the SFP+ transceiver modules from the expansion
card, see
"Removing SFP+ transceiver modules" on page
118
51.
49.
Upgrade and Maintenance Manual
296.
70.
5 minutes
45.
111.
57.
88.
45.