Fujitsu PRIMERGY CX2550 M6 Upgrade And Maintenance Manual page 248

Table of Contents

Advertisement

System board and components
Preliminary steps
"Shutting down the server node" on page
▶ Remove all external cables from the server node.
"Removing server nodes from the server enclosure" on page
"Removing a riser module" on page
Installing the Dual microSD 64GB Enterprise
Figure 170: Connecting the cable to the Dual microSD 64GB Enterprise
▶ Connect the cable to connector "CON2" on the Dual microSD 64GB
Enterprise.
248
49.
Upgrade and Maintenance Manual
45.
45.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2560 m6

Table of Contents