Figure 60: Attaching the dedicated internal RAID module
▶ Place the dedicated internal RAID module as shown.
▶ Fasten the dedicated internal RAID module with three screws (see circles).
Screw type: M3 x 5.5 mm
Tools: Phillips PH2 / (+) No.2, hexagonal cross SW5
Figure 61: Installing the node link bar
▶ Align the guide pins of the node link bar.
▶ Install the node link bar.
Expansion cards and OCP mezzanine cards
Upgrade and Maintenance Manual
127