Replacing Memory Modules - Fujitsu PRIMERGY CX2550 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Liquid cooling (LC)
Concluding steps
"Installing the memory slot air ducts for liquid cooling (only CX2550 M6)" on
page
56.
"Installing a riser module" on page
"Installing the CX2550 M6 or CX2560 M6 server node" on page
▶ If applicable, reconnect all external cables.
"Switching on the server node" on page
"Enabling the boot watchdog" on page
▶ If applicable,
"Resuming BitLocker functionality" on page
9.4.3

Replacing memory modules

Upgrade and Repair Unit
(URU)
Tools:
Tool-less
CAUTION
Use only released configurations to ensure a faultless operation of
the system.
Before changing the memory configuration, verify if the
configuration is released. Please contact your sales outlet or our
customer service center.
Preliminary steps
▶ If applicable,
"Suspending BitLocker functionality" on page
"Disabling the boot watchdog" on page
▶ Locate the desired server node with the ID button.
"Shutting down the server node" on page
▶ If applicable, remove all external cables from the server node.
"Removing server nodes from the server enclosure" on page
216
51.
73.
62.
Upgrade and Maintenance Manual
59.
81.
Hardware: 5 minutes
45.
57.
61.
45.