Remove The Bezel; Releasing The Cable Management Arm - HPE Apollo 4200 Gen10 Plus Maintenance And Service Manual

Table of Contents

Advertisement

IMPORTANT:
IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to the system.
Before powering down the system for any upgrade or maintenance procedures, perform a backup of critical server data and programs.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If an application stops
responding, you can use this method to force a shutdown.
Use a virtual power button selection through iLO 5.
This method initiates a controlled remote shutdown of applications and the OS before the server enters standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is amber.

Remove the bezel

Remove the bezel
To access the front panel components, unlock and then remove the bezel.

Releasing the cable management arm

Releasing the cable management arm
Release the cable management arm and then swing the arm away from the rack.
Extend the server
Extend the
server from the rack
from the rack
HPE Apollo 4200 Gen10 Plus Server Maintenance and Service Guide
19

Advertisement

Table of Contents
loading

Table of Contents