Toyota 1C Repair Manual page 95

Table of Contents

Advertisement

ENGINE MECHANICAL - Cylinder Block
EM-89
7.
INSTALL CONNECTING ROD CAPS
(a)
Chec k the numbered rod cap with the numbered rod .
(bl
Install the rod caps with the front mark facin g for-
ward .
(c)
Apply a light coat of the engine oil on the th reads and
under of the rod nuts.
(d)
Install and tighten the rod nuts alternately and in two
or three passes.
Torque :
650 kg -c m (47 ft -lb , 64 N ·ml
(el
Check that the crankshaft turns smoothly.
(I)
Check the rod thru st clearance.
(See step 1 6 on page EM- 72)
8.
INSTALL OIL COOLER AND PIPES
Torque:
Oil cooler
575 kg -cm (42 ft-lb, 56 N·ml
Oil pipe
525 kg-cm (34 ft -lb , 51 N ·m)
9 .
INSTALL TURBOCHARGER Oil PIPES
Torque:
Inlet pipe
250 kg -c m {1 8 ft -lb , 25 N ·ml
Outlet pipe
475 kg -cm {34 ft -lb, 47 N ·ml
10. INSTALL Oil FILTER BRACKE T AND NEW FILTER
11 . INSTALL REAR OIL SEAL RETAINER AND DUST SEAL
Apply seal packing to the crankshaft oil seal retainer .
Seal packing :
Part No . 08826 -00080 or equivalen t .
12. INSTALL OIL PUMP (See ste p 1 o n page LU- 9)
13 . INSTALL OIL STRA INER AND Oil PAN
(See steps 2 to 4 on page LU -101
14. INSTALL ALTERNATOR W ITH OIL HOSES
15 . INSTALL WATER PUMP (See step 1 on page C0-6)
16 . IN STA LL INJECTION PUMP
(See step 3 on page FU-52)
17 . INSTALL CYLINDER HEAD
(See pages EM -66 to 69)

Advertisement

Table of Contents
loading

This manual is also suitable for:

2c2c-t

Table of Contents