Hardware Installation and Reference Guid
Gas
Chlorine gas (CI
Note
Average refers to the average value of harmful gases measured in one week. Maximum
refers to the upper limit of harmful gases measured in one week, and the maximum
value lasts up to 30 minutes every day.
2.2.6
Anti-interference Requirements
Take interference prevention measures for the power supply system.
Keep the device away from the grounding equipment or lightning and grounding
equipment of the power device as much as possible.
Keep the device far away from high-frequency current devices such as high-power
radio transmitting station and radar launcher.
Take electromagnetic shielding measures when necessary.
2.2.7
Installation Site Requirements
Regardless of whether the device is installed on the wall or ceiling, the following
conditions must be met:
Maintain a minimum clearance of 0.4 cm (15.75 in.) around the device to ensure
proper cooling and ventilation.
The installation site allows for proper cooling and ventilation.
The installation side is sturdy enough to support the weight of the device and its
accessories.
2.3
Tools
Table 2-3
Tools
Common
Tools
Average (mg/m
)
0.01
2
Phillips screwdrivers, wires, Ethernet cable, fastening bolts, diagonal
pliers, and binding straps
)
3
13
Preparing for Installation
Maximum (mg/m
3
0.3
)
Need help?
Do you have a question about the RG-AP810-I and is the answer not in the manual?
Questions and answers