Hardware Installation and Reference Guid
4

Verifying Operating Status

4.1

Configuring the Environment

Use a power adapter or PoE to power the AP.
Setting up the Environment
Verify that the AP is properly connected to the power source.
Connect the AP to an AC through a twisted pair cable.
When the AP is connected to a PC, verify that the PC and PoE switch are properly
grounded.
4.2

Powering up the AP

4.2.1

Checking Environment before Power-on

Verify that the power supply is properly connected.
Verify that the input voltage matches the specification of the AP.
4.2.2

Checking Environment after Power-on

After power-on, you are advised to check the following to ensure normal operation of the
AP.
Check if any message is printed on the Web-based configuration interface of the
device.
Check if the LED works normally.
25
Verifying Operating Status

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-AP810-I and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents