Assembly And Commissioning; Commissioning - Norton Clipper CB 311 Operating Instructions Manual

Table of Contents

Advertisement

VERS.2017.11.22
CB311_MAN_EN

3 ASSEMBLY AND COMMISSIONING

The machine is delivered fully equipped (although without diamond blade). It is ready for operation
when you mount the diamond blade, the handles and the conveyor cart and after you connect to the
appropriate power supply.

3.1 Commissioning

3.1.1 Loosen the two star grips and lower the table supporting it with your hands.
Fig.1
3.1.2 After straightening the table, immediately lock the 2 star grips.
3.1.3 Then press the green START button. Check that the light (Fig. 3) is on: this indicates that the
machine is ready for operation.
Fig.3
Fig.2
15

Advertisement

Table of Contents
loading

Table of Contents