Assembly And Commissioning; Tool Assembly; Conveyor Cart And Handle Assembly; Electrical Connections - Norton clipper CGW EVO D400 Operating Instructions Manual

Table of Contents

Advertisement

3 Assembly and commissioning

The machine is delivered fully equipped (although without diamond blade). It is ready for operation
assembly the diamond blade, the feet and the conveyor cart and after connection to the appropriate
power supply.

3.1 Tool assembly

Only NORTON blades with a maximum diameter of 350 mm can be used with the CGW EVO.
All tools used must be selected with regard to their maximum permitted cutting speed for the
machine's maximum permitted rotation speed. Before mounting a new blade into the machine,
switch off the machine and isolate it from the main source of electricity.
To mount a new blade, follow these steps:
Open the blade guard.
Loosen the hexagonal nut on the blade shaft (Caution: left threaded), which holds the removable
outer flange.
Remove the outer flange.
Clean the flanges and blade shaft and inspect for wear.
Mount the blade on arbor ensuring that direction of rotation is correct. Wrong direction of rotation
blunts the blade quickly.
Replace outer blade flange.
Tighten hexagonal nut with spanner supplied for this purpose.
Close the blade guard and retighten clamp on the front of the guard.
The blade bore must correspond exactly to the diameter of the blade shaft. Cracked or damaged
bore is dangerous for the operator and for the machine.

3.2 Conveyor cart and handle assembly

Handle and conveyor cart are located in the water pan.
Place the conveyor cart on the guiding rails with the material stop facing the operator.
Assemble the handles with the supplied M10 screws.

3.3 Electrical connections

Check that,
the voltage/phase supply corresponds to the information indicated on the motor plate.
Available power supply must have ground connection in conformity with safety regulations.
The connecting cables should have at least a 2.5mm

3.4 Starting the machine

Open the cover on the switch and press the green button to start the machine. Either press on the
red button or directly on the switch cover to stop the machine.
2
-section per phase.
11

Advertisement

Table of Contents
loading

Table of Contents