82
8.5. Check the Running State On-line
If you have completed commissioning as described in section 10.3.2, please ignore
this section.
You can also commission the system after WiFi configuration.
Please make sure the PV switch and battery breakers and all the breakers connecting
to the product are ON.
8.5.1. Check the Charging Function of the Product
To make sure the system is installed and operating correctly, please set the
system to "Charging/Discharging Setting" by following the instructions below.