NOTE:
The communication cable is in type B, see Figure 26. Leave the power cables and
communication cables hang on the outside. Leave the device aside.
Figure 27 Inverter Installation on the Wall
Step16
Hang the inverter onto the wall bracket, adjust the entire system and ensure
that the battery and the inverter have been securely hung onto the panels and brackets.
Figure 28 Wiring the Communication Cable
INTRODUCTION
INTRODUCTION
Step17
topmost battery at the right side. Then use the communication cable supplied with the
batteries to connect the batteries to each other via the respective connectors on the left
side. After you have connected all the modules together, close all covers (if you want to
connect further battery modules, you must mount them before closing).
Step18
terminals of the top battery. Make sure that red connects to red and black connects to
black.
Connect the BAT communication cable of the cable box from Step 14 to the
Figure 29 Wiring the Battery Power Cable
Connect the power cables of the bottom battery from Step 4 to the side
Figure 30 Wiring the Power Cable of the Cable Box