Alpha ESS SMILE5 Installation, Operation & Maintenance Manual page 20

Energy storage system
Table of Contents

Advertisement

35
2.3.4 Backup Box (If Applicable)
Backup Box Connect to SMILE5 (single-phase grid in house):
Patch Cable recommend CAT
Meter Port
ś
PV
SMILE -B3
LOAD 3
SMILE 5
BACKUP
AC
Ś
PV
PV-INV
meter
Figure 57 Backup Box Connect to SMILE5 (single phase grid in house)
For more details please refer to the quick installation manual of backup box.
2.3.5 Meter Setting
2.3.5.1 SM60A
0000
There are 3 buttons on the front of
the electricity meter:
0000
kWh
1. Down arrow: shift button
2. Up arrow: value adjustion
3. Enter button / Menu button
INTRODUCTION
5
LOAD 2
LOAD 1
meter patch cable
for backup box
L
N
PE
DSP _BackupBox
INTRODUCTION
Step 1: Click the "Enter" button to
enter the menu interface.
CODE
Step 3: You will get into the code
interface. Then click the "Shift" button to
enter the address interface..
GRID
AODR
Step 5: Click the "Enter" button to get
back to the menu interface. Then click
the "Shift" button 5 times to enter the
save interface.
2.3.5.2 ADL3000
T
E
000006.45
PASS
Step 2: Click the "Enter" button to input
the password. The initial password is
0000. Then click the "Enter" button.
ADDR
Step 4: Please set the meter address by
using the "Value adjustment" button, the
Grid meter (DC, AC and Hybrid system)
address is set to 003, and the PV meter (AC
and Hybrid system) address is set to 004.
SAVE
Step 6: Click the "Shift" button to save the
setting.
There are 4 buttons on the front of the
electricity meter:
kWh
1. Enter button / Energy button
SET
2. Down arrow / Power button
3. Up arrow / Voltage & current button
4. SET button
36
P-
0000
A-
003
S-
S-
NO
YES