Alpha ESS SMILE5 Installation, Operation & Maintenance Manual page 12

Energy storage system
Table of Contents

Advertisement

19
Figure 23 Cable Box Bottom View, Wiring Connectors
Step13-5
Connect the Backup and Grid cables in advance according to the connector
mode, and connect them to the Backup and Grid board connectors in turn.
NOTE: Recommended AC circuit breaker rating is 32A.
NOTE: Installer in Australia or New Zealand must install external circuit
breaker or switch for PV, backup and grid side.
NOTE: In Australia and New Zealand, the neutral of backup and grid circuit
should be externally connected on the neutral bar.
NOTE: The type AC RCD must be installed on the backup port of the system.
In addition, the installation of inverter must fulfill AS/NZS 3000, AS/NZS
4777.1 and AS/NZS 5033.
NOTE: No external earthing required. After the PE line of AC cables has
been grounded, the whole inverter including the case will be grounded.
WiFi Panel
Figure 24 WiFi Module installation
INTRODUCTION
INTRODUCTION
Step14
screwdriver, torque: 1.6Nm). Please refer to section 5 configuration network
instructions.
Step15
SMILE5-BAT, cut off one end and crimp a new RJ45 connector. If there are two
batteries, you only need to remake one of battery communication cable on site.
Remove the WiFi panel on the top and install the WiFi module (tool: T20
Figure 25 Communication interface of the inverter
Take out the communication cable set provided in the accessory parts of one
Figure 26 Network Cable Type B
20

Advertisement

Table of Contents
loading

Table of Contents