Fujitsu AIRSTAGE J-II Design & Technical Manual page 814

Hide thumbs Also See for AIRSTAGE J-II:
Table of Contents

Advertisement

Installing pipe
z
Gap of 1.5-2m
Supporter
VP25
[O.D.32mm]
or more
Observe the following procedures to construct centralized drain pipe fittings.
Electrical wiring
z
Control box
Indoor unit
Locally
arranged pipe
VP30 [O.D.38mm]or more
Drain pump wire
Circuit board
(Connector : Blue)
Control box cover
To indoor unit circuit board
- (10 - 62) -
Rise
Trap
Bad
Drain pump unit
Float switch wire
(Connector : Red)
Air bleeding

Advertisement

Table of Contents
loading

Table of Contents