Fujitsu AIRSTAGE J-II Design & Technical Manual page 483

Hide thumbs Also See for AIRSTAGE J-II:
Table of Contents

Advertisement

Decide the mounting position with the customer as follows:
(1) Install EV kit level on strong wall, floor, ceiling which is not subject to vibration.
(2) Install EV kit where the connection pipe can be easily installed.
(3) Install EV kit where vibration and noise are not amplified.
(4) Take servicing, etc. into consideration and leave the space as follows.
300mm
INSTALLATION METHOD
The installation direction can be selected either horizontal (Pattern A) or vertical (Pattern B),
but keep the inclination within 5º.
Incorrect installation direction or angle may cause improper operation.
Suspended installation
z
(1) Remove the 2 screws (M4x10) and replace them with the hanger.
(2) Use the hanger bolts to fasten the hanger.
Hanger
Screw
(M4 x 10)
Pattern A
Level
Cord
Horizontal installation
- (06 - 41) -
CAUTION
Vertical installation
Pattern B
Level
Cord
M10 hanger bolt
(Field supplied)
Special nut A
Special nut B

Advertisement

Table of Contents
loading

Table of Contents