OPERATION

7.1

TRAINING THE OPERATING PERSONNEL

The operating personnel must be qualified to operate the entire system.
The operating staff must be familiar with the potential risks associated with improper
behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2

TASKS

Ensure that:
the regular safety checks are carried out in accordance with Chapter 8.2.3;
commissioning is carried out in accordance with Chapter 6.
7.3

OPERATING MODES

The powder pump can be operated in two ways:
– in conjunction with a powder center or BigBag
– used as a transfer pump
7.4

OPERATION WITH WAGNER POWDER CENTER

The powder pump is controlled via the powder center controller. The powder pump is
operated via the powder center touch screen (from PZ 2005).
Attention:
The powder pump can only be operated when the ventilator is switched on.
Standard equipment:
Two recipes for full or reduced flow rate are available.
The powder pump has a self-cleaning mode, which can be switched on via the powder
center or at the powder pump. First, the hoses are emptied, then the powder pump
cleaning function is activated.
The powder pump can be switched on and off manually with the START/STOP button,
or automatically via the powder level monitoring.
ORDER NUMBER DOC241936
IP 5000
32