WAGNER IP 5000 Translation Of The Original Operating Manual page 27

Fresh powder and transfer pump
Hide thumbs Also See for IP 5000:
Table of Contents

Advertisement

EDITION 08/2021
The powder pump is fixed next to the feed tank, for example the powder center or BigBag.
Work steps:
1. Mount the powder pump at installation location (fastening set order no. 241550,
available as an accessory).
2. Loosen the Allen screw 5 at plug 2 and unscrew it so that the safety clip 6 on plug 2
can be opened.
3. Connect the grounding cable to grounding screw 1.
4. Connect +24 VDC supply voltage and signal lines to upper part of plug in accordance
with configuration plan (see Chapter 13.1).
5. Attach 24 VDC electric cable to the plug 2 and secure with safety clip 6.
WARNING
IP Code of device not guaranteed!
Explosion hazard and damage to the device.
After completing the connection work, the safety clip on the connecting plug must
be secured again with a screw to prevent unintentional opening (ATEX regulation)!
6. Connect the compressed air hose (e.g., order no. 700095, Ø 1/2") to the compressed
air connection 3.
7. Push feed hoses onto the inlet and outlet valve and secure with hose clips
(note installation direction of feed hose).
ORDER NUMBER DOC241936
2
6
5
P_04307
IP 5000
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip 5000-usd

Table of Contents