Electrical Connection Overview - Sungrow SG8.0RS User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG8.0RS:
Table of Contents

Advertisement

User Manual
table 5-2 Label Description of COM2 Terminal
Label
Meter
RS485-1
RSD
DRM
5.3

Electrical Connection Overview

The electrical connection should be realized as follows:
(A) PV string
(D) Grid
(G) Smart energy meter
The electrical connection should be realized as follows(Includes optimizer):
figure 5-2 Label of COM2 Terminal
Description
For the smart energy meter
A2, B2
A1, B1
Reserved
RSD-1,
Reserved
RSD-2
R, C, D4/8,
For external Demand Response Enabling Device ("AU"/
D3/7, D2/6,
"NZ")
D1/5
(B) Inverter
(E) External device
5 Electrical Connection
(C) Loads
(F) AC circuit breaker
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5.0rs-adaSg9.0rsSg10rs

Table of Contents