Sungrow SG8.0RS User Manual page 50

1-phase pv grid-connected inverter
Hide thumbs Also See for SG8.0RS:
Table of Contents

Advertisement

5 Electrical Connection
step 6 Secure the AC waterproof cover to the inverter with a torque of 1.0 N•m and tighten the swiv-
el nut to a torque of 5 N•m–6 N•m.
step 7 Connect the PE wire to ground and the phase lines and the "N" line to AC circuit breaker.
Then connect the AC circuit breaker to electric board.
step 8 Make sure all wires are firmly installed via the right torque tool or dragging the cables slightly.
- - End
40
User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5.0rs-adaSg9.0rsSg10rs

Table of Contents