6 Commissioning
If the communication equipment is upgraded, after successful upgrade, check and
confirm that the phone is connected to the inverter WLAN.
step 3 Tap Country/Region and select the country where the inverter is installed at. The supported
countries and corresponding settings are as follows.
Country/Region
Australia ("AU")
New Zealand ("NZ")
Chile
Brazil ("BR")
The parameter Country/Region must be set to the country (region) where the inver-
ter is installed at. Otherwise, the inverter may report errors.
step 4 When the country is set to Australia, additionally set the applicable network service provider
and then the grid type.
68
figure 6-4 Upgrading Inverter
Setting
Australia
New Zealand
Chile
Brazil