Sungrow SG8.0RS User Manual page 60

1-phase pv grid-connected inverter
Hide thumbs Also See for SG8.0RS:
Table of Contents

Advertisement

5 Electrical Connection
step 3 Unscrew the housing from the communication module.
step 4 Thread the network cable through the swivel nut and gasket. Afterwards, route the cable into
the opening of the sealing. Finally, insert the cable through the housing.
step 5 Insert the RJ45 plug into the front plug connector until there is an audible click and tighten
the housing. Install the gasket and fasten the swivel nut.
step 6 Remove the waterproof lid from the COM1 terminal and install WiNet-S/WiNet-S2.
50
User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5.0rs-adaSg9.0rsSg10rs

Table of Contents