Sungrow SG8.0RS User Manual page 81

1-phase pv grid-connected inverter
Hide thumbs Also See for SG8.0RS:
Table of Contents

Advertisement

User Manual
The distributor/installer who creates a plant for the end user needs to get the end user's e-
mail address. In configuring a plant, the e-mail address is required, and each e-mail address
can be registered only once.
step 1 The App screen will display the added inverter. Tap NEXT to configure the plant.
step 2 Fill in the plant information. The fields marked with * must be filled in.
step 3 (Optional) Fill in the tariff information. The electricity price can be set to a specific value or
Time-of-Use tariff.
figure 6-6 Display the Added Inverter
figure 6-7 Entering Plant Information
6 Commissioning
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5.0rs-adaSg9.0rsSg10rs

Table of Contents