Login; Requirements; Login Procedure - Sungrow SG8.0RS User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG8.0RS:
Table of Contents

Advertisement

User Manual
step 4 Fill in the registration information, including email, verification code, password and affirm-
ance and country (region). The distributor/installer has the permission to fill in the company
name and the code of upper level installer/distributor.
The code of upper level distributor/installer can be obtained from the upper level
distributor/installer. Only when your organization belongs to the upper level distrib-
utor/installer organization, can you fill in the corresponding code.
step 5 Tick Accept privacy protocol and tap Register to finish the registration operation.
- - End
7.4

Login

7.4.1 Requirements

The following requirements should be met:
The AC and DC sides or the AC side of the inverter is powered-on.
The WLAN function of the mobile phone is enabled.
The mobile phone is within the coverage of the wireless network produced by the com-
munication module.

7.4.2 Login Procedure

step 1 For the WiNet-S module, press the multi-function button 3 times to enable the WLAN hot-
spot. No password is required and the valid time is 30 minutes.WiNet-S2 skip this step.
7 iSolarCloud App
77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5.0rs-adaSg9.0rsSg10rs

Table of Contents