TGB BLADE 425 Service Manual page 107

Table of Contents

Advertisement

Transmission system
Remove
Remove the driven output rear shaft and front shaft.
Separate the driven output rear shaft and front shaft.
Remove the c-ring from the universal joint assy.
Remove the driven output front shaft with a chisel.
Remove the joint parts.
Using a vise let the driven output rear shaft held in
movable.
Replace the removed nut and use a new one
when reassemble.
9-1
Final driving mechanism

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blade 400

Table of Contents